Public Notice Details


Project Information
Project Type REQUEST FOR STATEMENTS OF QUALIFICATIONS
Project Manager Dinah Neumann (Dinah@wcwcd.gov)   
Project Description

The district is seeking statements of qualifications from qualified design professionals to provide Engineering Design and Construction Management Services for the LaVerkin Pond & Pipeline Project.
This project is a component of the overall Regional Reuse Purification Program and is also tied to the LaVerkin Secondary System Improvement Project, identified in the district’s 20-Year Plan.

This LaVerkin Pond and Pipeline project includes the design and construction management of a concrete settling pond and an adjacent lined pressure regulating pond that will serve as a pump forebay for two future pump stations. The first pump station will be a low-head, high volume pump station to boost pressure into the LaVerkin Secondary System and is included in the scope of this project. The second pump station will eventually convey Type I reuse water produced during winter months to Chief Toquer Reservoir for storage and use in the Toquerville Secondary System. The scope of this project will only consider the space and connections needed for the future pump station, while design and construction management will be part of a future project. The preliminary layout and design of the facilities will be coordinated with the district and the landowner, from whom land is being acquired. This project also includes design and construction management of approximately 6,000 ft of 18-inch Ductile Iron Pipe to convey Type I Reuse water from the CPWRF to the new pressure regulating pond

Consultant(s) N/A
Open March 25, 2025
Close April 11, 2025 5:00 pm
Vendor(s) N/A

Contact & Planholders List

Sign up to be added to the contact or plan holders list to receive addenda and revisions, project notifications and other project information.

Public Notice

REQUEST FOR STATEMENTS OF QUALIFICATIONS - Engineering Design & Construction Management Services LaVerkin Pond & Pipeline Project (3/25/2025)

PUBLIC NOTICE: REQUEST FOR STATEMENTS OF QUALIFICATIONS

The Washington County Water Conservancy District (district) is seeking statements of qualifications for Engineering Design and Construction Management Services for the LaVerkin Pond and Pipeline Project. Statements of qualifications must be received by the district no later than Friday, April 11th, 2025, 5:00 pm.

Click here to view the Request for Statements of Qualifications. Questions regarding this solicitation should be addressed to Dinah by phone at (435) 673-3617 (office) or email at dinah@wcwcd.gov.

Please email Dinah Neumann, dinah@wcwcd.gov if you intend to submit a statement of qualifications (SOQ) so that we may notify you if an addendum to this SOQ is made.

Project Documents and Information

                                (Click to Download)

Contact & Planholders List

    Send message to Dinah Neumann at Dinah@wcwcd.gov