Public Notice Details


Project Information
Project Type INVITATION FOR BIDS
Project Manager Jeremy Williams (jswilliams@hazenandsawyer.com)   
Project Description

Separate sealed bids (hard copies) for the Quail Creek Water Treatment Plant 90 mgd Expansion and Ozone Addition – Phase 2 (Project) will be received by Washington County Water Conservancy District at its office at 533 East Waterworks Drive, St. George, Utah 84770, until no later than 11:00 AM, Thursday March 27, 2025. At that time bids will be publicly opened and read aloud.

The Project consists of demolition of the existing pretreatment basins and floc/sed basins, and demolition, replacement, and installation of large diameter piping/piping appurtenances as outlined in the Contract Documents. The Project also includes bid alternates for demolition of the existing East and West waste backwash water drying beds, construction of three new concrete-lined waste backwash water drying beds, large diameter welded steel finished water piping, and construction of a new detention basin for stormwater, plant drains, and overflows.

The project is located at the Quail Creek Water Treatment Plant at 270 N 5300 W, Hurricane, UT (approximately 10 miles northwest of St. George, Utah).

 

Consultant(s) Jeremy Williams
Open February 14, 2025
Close March 27, 2025 11:00 am
Vendor(s) N/A

Contact & Planholders List

Sign up to be added to the contact or plan holders list to receive addenda and revisions, project notifications and other project information.

Public Notice

INVITATION FOR BIDS-Quail Creek Water Treatment Plant 90 mgd Expansion and Ozone Addition – Phase 2 (Project)

PUBLIC NOTICE

Separate sealed bids (hard copies) for the Quail Creek Water Treatment Plant 90 mgd Expansion and Ozone AdditionPhase 2 (Project) will be received by Washington County Water Conservancy District at its office at 533 East Waterworks Drive, St. George, Utah 84770, until no later than 11:00 AM, Thursday March 27, 2025. At that time bids will be publicly opened and read aloud.

The Project consists of demolition of the existing pretreatment basins and floc/sed basins, and demolition, replacement, and installation of large diameter piping/piping appurtenances as outlined in the Contract Documents. The Project also includes bid alternates for demolition of the existing East and West waste backwash water drying beds, construction of three new concrete-lined waste backwash water drying beds, large diameter welded steel finished water piping, and construction of a new detention basin for stormwater, plant drains, and overflows.

The project is located at the Quail Creek Water Treatment Plant at 270 N 5300 W, Hurricane, UT (approximately 10 miles northwest of St. George, Utah).

A mandatory pre-bid conference and site visit will be held at the Quail Creek Water Treatment Plant in Hurricane, UT, Thursday March 6, 2025, at 2:00 PM. Any bidder not attending the pre-bid conference will be considered non-responsive.

Contact Hazen and Sawyer (Attn: Jeremy Williams) at (385) 342-1082 or jswilliams@hazenandsawyer.com to be placed on the plan holders list and to obtain copies of the bidding document. Bidding documents will become available on February 20, 2025 at 10:00 a.m. MST. Bidders must be on the plan holders list to submit a bid.

Copies of the Contract Documents and Specifications are available for free via email.

Project Documents and Information

Contact & Planholders List

    Send message to Jeremy Williams at jswilliams@hazenandsawyer.com