Public Notice Details


Project Information
Project Type INVITATION FOR BIDS
Project Manager Todd Gardner, Alpha Engineering (toddgardner@alphaengineering.com)   
Project Description

Separate sealed bids for Sand Hollow Well #7 Pump Station Project will be received by the Washington County Water Conservancy District at its office at 533 East Waterworks Drive, St. George, Utah 84770, until no later than 10:00 am, Wednesday, March 26, 2025 (MDT). At that time bids will be publicly opened and read aloud.

No pre-bid conference will be held.

The Project consists of construction of a complete and functional wellhouse and connecting pipeline.  Work consists of furnishing and installing a concrete cast-in-place building, sand separator, piping, valves, fittings, heating/cooling equipment, electrical power, lighting and control systems, site grading, and furnishing and installing approximately 75 linear feet of 8” ductile iron pipe with a tie-in to an existing 8” pipeline. The Owner will furnish the pump, motor, VFD, and 6” magnetic meter. Work also includes coordinating with the pump supplier for installation of the Owner furnished vertical turbine pump with deep well column/shaft and pump bowls.

See Public Notice for contacts and additional information.

Consultant(s) Todd Gardner, Alpha Engineering
Open March 3, 2025
Close March 26, 2025 10:00 am
Vendor(s) n/a

Contact & Planholders List

Sign up to be added to the contact or plan holders list to receive addenda and revisions, project notifications and other project information.

Public Notice

INVITATION FOR BIDS-Sand Hollow Well #7 Pump Station Project

PUBLIC NOTICE

Separate sealed bids for Sand Hollow Well #7 Pump Station Project will be received by the Washington County Water Conservancy District at its office at 533 East Waterworks Drive, St. George, Utah 84770, until no later than 10:00 am, Wednesday, March 26, 2025 (MDT). At that time bids will be publicly opened and read aloud.

No pre-bid conference will be held.

The Project consists of construction of a complete and functional wellhouse and connecting pipeline.  Work consists of furnishing and installing a concrete cast-in-place building, sand separator, piping, valves, fittings, heating/cooling equipment, electrical power, lighting and control systems, site grading, and furnishing and installing approximately 75 linear feet of 8” ductile iron pipe with a tie-in to an existing 8” pipeline. The Owner will furnish the pump, motor, VFD, and 6” magnetic meter. Work also includes coordinating with the pump supplier for installation of the Owner furnished vertical turbine pump with deep well column/shaft and pump bowls.

Contact Todd Gardner, Alpha Engineering at (435) 628-6500 to be placed on the plan holders list. Bidders must be on the plan holders list to submit a bid. Copies of the Contract Documents and Specifications may be examined and/or obtained at Alpha Engineering, 43 South 100 East, Suite 100, St. George, Utah 84770.  Printed copies are available for $75.00 per set.

Questions can be submitted thru March 21, 2025 contact Todd Gardner, Alpha Engineering at (435) 628-6500.

Project Documents and Information

 

Contact & Planholders List

    Send message to Todd Gardner, Alpha Engineering at toddgardner@alphaengineering.com